1 * 2022 S-100 Testbed plan of KHOA
2 ** In consideration of the requirements for the S-100 development and Decision C5/60
3 ** KHOA tested the technical issues of S-100 and the usability and economic efficiency of the S-100 based product service
4
5
6 * Technical issues of S-100 
7 ** S-98 Interoperability
8 *** combined interoperability functions into S-100 ECDIS simulation system and the KHOA Viewer for testing according to S-98 Part A and Part B
9 *** The testbed applied interoperability catalogue from the ROK-USA joint project (from 2020 to 2021)
10 *** Checked S-101, S-102, S-111, S-124 and S-12X NPUB data overlays based on the Interoperability Catalogue
11
12 [[image:1669102503305-531.png]]
13
14
15 * Technical issues of S-100 
16 ** DF-mode in S-100 testbed system
17 *** items below are applied to the S-100 ECDIS simulation system
18 **** S-101 ENC has priority over S-57 ENC
19 **** Display of S-57 ENC in areas without S-101 ENC
20 **** When S-57 ENC is displayed on screen, it is indicated that S-57 ENC is shown
21 **** When S-57 ENC and S-101 ENC are displayed at the same time, the boundary between the datasets is displayed
22 **** Ensure that the symbols and colours between S-57 ENC and S-101 ENC are the same
23 *** Loading both S-57 and S-101 ENC went well
24 *** symbol colours and chart display scale were different
25 *** Adjusted the colour table and chart display scale based on the Dual Fuel governance, and the boundary of S-57 has been added as well
26
27 [[image:1669102316426-741.png]]
28
29
30 * Technical issues of S-100 
31 ** Up-to-dateness of S-100 data using the S-128 CNP
32 *** Produced the S-128 TDS and checked the up-to-dateness of products on the S-100 navigation system.
33 *** Through the chart manager function of the S-100 navigation system, checking and filtering products whether they are up-to-date or not can be distinguished
34 *** Shows the process for verifying the up-to-dateness using the S-128 dataset and S-100 data update status report in the S-100 navigation system.
35 *** The update status report was developed according to the S-98 Annex C guidelines
36
37 [[image:1669102451565-157.png]]
38